Today our toilet was removed at 10 am and the subfloor removed, new subfloor put in, and new lino put on top. The toilet was replaced at about 5 pm. Luckily I had top be at work for much of it. The shower is theoretically done but the tap and shower head are not yet attached. The last bits of plastering were done today so tomorrow will be one last sanding and then primer. It still seems like a long way to go.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment